Borri spa announces virtual factory acceptance testing

Power Control
14 May 2020

Power Control Ltd confirms that one of its key Uninterruptible Power Supply (UPS) partners, Borri Spa has developed a live streaming facility for Factory Acceptance Testing (FAT). This will bring invaluable benefits to those needing to fulfil projects and time sensitive contractual obligations.

All FAT procedures will be carried out at the 20,000 m² Borri headquarters in Bibbenia, Italy. The company has fitted out its test facility with a suite of state of the art cameras. These will provide a live feed of all physical assessments, whilst also enabling direct interaction with the test field engineer and an assigned project manager. Each FAT that is carried out is fully documented and supplied in full to the client. 

Delivered through the Borri Live Streaming channel, which is accessible through Microsoft Teams, the company has released a YouTube tutorial which gives a snapshot of how a ‘virtual’ FAT would be executed. The video can be viewed at: https://www.youtube.com/watch?v=S7HY-bc2nMY&feature=youtu.be 

As a leading power protection specialist, Power Control has been a key partner for Borri Spa since 2009 and has been instrumental in positioning Borri UPS solutions within the UK market. The Borri portfolio offered by Power Control includes standalone UPS solutions from 10kVA – 4.MVA and exclusively engineered CBS (Central Battery Systems) for life safety applications.  

With nearly 30 years of experience, Power Control has forged valuable relationships with leading contractors, consultants and UPS manufacturers. The company has an extensive single and three phase UPS product portfolio. It includes leading edge standalone and modular technologies, which are all fully supported by in-house project management and nationwide maintenance services.   

For further information please visit www.powercontrol.co.uk, email info@powercontrol.co.uk or call 0800 136993